PLANT RELOCATION

LATEST NEWS


Air Conditioner   Security Cages

TSM now offers Expertly Made Air Conditioner Security Cages


CNC Plasma Cutter

TSM now offers High-Definition Plasma Capabilities

Dust Collectors

Looking for dust collectors? If you haven’t noticed yet, they come in all shapes and sizes...


Machine Guards

Many injuries in an industrial workplace can be prevented through the use of machine guards...


Robotic Palletizer

The use of a robotic palletizer has become the system of choice for manufacturers who require flexibility...


 




 




 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Whether you manage a die tooling company or a food processing plant, when you need a plant relocation the needs are the same:  as fast, cheap and simple as possible.  Of course plant relocation is not a simple project, but when 30,000 square foot facilities can be moved over a single weekend, something is going right.  And while TSM Houston (Texas Sheet Metal) can’t guarantee an over-the-weekend move, we can make sure you have the best experience possible. 

 

Plant Relocation

TSM Houston will thoroughly plan and follow each step in a plant relocation beginning with the bidding stage, all the way to evaluating the new site.  A qualified engineer maps out the logistics for:


  • Mechanical and Electrical Disconnect Functions
  • Crating and Loading
  • Transportation
  • Off-Loading Equipment
  • Mechanical and Electrical Reconnect
  • Equipment Setting
  • Erection
  • Alignment
  • Process and Utility Piping Applications
  • Fabrication Support Services
  • Electrical and controls systems sub-contracting

 


We manage all major aspects of the plant relocation, which can be broken down into three main concepts:  the relocation strategy, time frames, and budget.

 

The relocation strategy reviews production requirements and recommend an optimized machinery move sequence based on the amount of down time involved.  Times frames pretty much says it all – determining how long it will take to move, disconnect, and connect each and every piece of equipment.  We also make sure to take into account building access features for the new plant, and any other concerns.  Finally, the budget, which we can guarantee to be competitive and cost effective, since money won’t have to be used up on multiple contractors and wasted time.

 

The TSM Houston plant relocation experience provides nearly every aspect of regular plant relocation except one:  aggravation.